- PN POWERSITE MANAGER
-
KENYArnINSTITUTE OF SPECIAL EDUCATION (HOSTEL RENOVATION WORKS)
rnrn
rnrn
- · rnProject site with civil works,rnElectrical works, Plumbing, roofing, painting and other associated works
- · rnEnsure all working guidelinesrnare followed
- · rnSafe working procedures
- · rnConduct inspection and makernrecommendations
- · rnEnsure quality of equipment andrnmaterials supplied
- ARYAN CONSULTACY SERVICESSITE MANAGER
-
KESSES 220/33KV SUBSTATION ELECTRICAL INSTALLTIONrnWORKS
rnrn
rnrn
- · rnPlan,rnassigns, schedules and supervises the work of electricians and helpers engagedrnin works
- · rnTrainrnand instructs subordinates on detailed procedures.
- · rnConductrnperiodic inspections and give on-site supervision over hazards and unusual workrnassignments.
- · rnEnsurernavailability of equipment, Materials and supplies.
- · rnEstimaternthe time and materials cost required for the projected job; keep cost and jobrnrecords and submit reports; initiate requisitions for supplies, tools and Equipment
- · rnConferrnwith other technical departments
- POLYPHASE SYSTEMS LTD ELECTRICAL SUPERVISOR
-
52MW MALINDIrnSOLAR POWER PLANT
rnrn
- · rnManagement andrnexecution of DC and AC, Earthing and communication cable
- · rnString conduitrnlaying
- · rnPier settingrnand alignment
- · rnSolar trackersrninstallations and hacking
- · rnSolar panel andrninverter installation
- · rnTX assembly andrninstallation works
- Testingrnand commissioning
- HISTOTO LIMITEDSITE SUPERVISOR
-
132KV/33KVrnKAMBURU AND 132KV/66KV MANGU SUBSTATION
rnrn
- · rnMakernrecommendation on proposed projects
- · rnEnforce safetyrnregulations, rules and working condition
- · rnStructuresrnerection, equipment and panel mounting procedures
- · rnEnsure qualityrnwork is paramount
rnrnrnrnrnrn
- POLYPHASE SYSTEMS LIMITED TEAM LEADER
-
MATAARA TEArnFACTORY HYDRO POWER PLANT
rnrn
- Heat shrink capable preparation
- Switch gear termination
- Transformerrn1000kva Termination
- OSERIAN DEVELOPMENT COMPANY ELECTRICAL TECHNICIAN
-
NAIVASHA FARM STATION
rnrn
- ATS switching
- Generator maintenance
- Booster pump maintenance
- Motor starters
- HT & LV lines
- Powerrnfactor corrections
- POLYPHASE SYSTEMS LTDEARTHING FOREMAN
-
OLKARIArnGEOTHERMAL POWER PLANT HYUNDAI PROJECT
rnrn
- Main mesh/grind earthing
- Earthingrnof generators, transformers, motors, switch gears, control panels andrnequipment.
- MEHTA ELECTRICAL LTDSTATION SUPERVISOR
-
OLKARIA 3 ORMATrnGEOTHERMAL POWER PLANT
rnrn
- Bus duct and switch gear bus bars assembly
- Flame and gas detector installation
- Battery charger, UPS and panel cabling/termination
- Cable tray management and installation
- Coldrnshrink splicing