Mechanical installation coordinator-Auto Cad Drafter ShortList


General Information

  • Language English, Kiswaili
  • Highest Degree Level Diploma
  • Total Year Experience 4
  • Job Category  Administration Staff
  • Expected Job Level Mid-level
  • CV Upload 3_Updated-CV.pdf
  • Passport Photo

LPG INSTALLATIONS COORDINATOR

Prepare Preliminary working drawings for LPG Plumbing installation

Prepare Bill of Quantities for client´s approval

Pre-visit new site to ascertain the scope of work

Updating working drawings as instructed by the Project Engineer

Evaluation of the work done

Prepare final account for the work completed

Interpreting Architectural drawings

Use of Microsoft Project to formulate work programme

Attend site meetings for work coordination

Ensure the work is done as instructed by the Project Engineer and at the agreed time schedule

Prepare as Built Drawings/Record drawings, as part of project commissioning

Training client on operation and maintenance of the LPG installation

MECHANICAL TECHNICIAN

Operating and maintaining Water tube boiler.

General machine maintenance; machine cleaning, oil refill, spare part replacement.

Monitoring and Supervising machine work rate during production.

Ensure production machines maintain good quality of the final products.

Operating and maintaining Reverse Osmosis machine.

Compiling a weekly report for the machine work rate during production.

0 Review

Rate This Resume ( No reviews yet )

Education
Work experience
Summary of skills

GENERAL PUBLIC NOTICE

We would like to inform the public that all jobs that Silver RayHR posts are only found on our website and our official Social Media accounts only. The links to our official accounts can be found on the right. Please remember Silver RayHR does not charge candidates for job opportunities!

Contact Us

LOCATION: Agip House, 1st Floor Wing B.
ADDRESS: P.O Box 44248 - 00100 Nairobi Kenya
CELL: +254 726 406 832 / +254 714 189 091
EMAIL: info@silverrayhr.com